The current cafeteria construction
and renovations at the
newtown campus have
grabbed the attention of Bucks
students.
One half of the cafeteria is
currently being remodeled so
students will still be able to
purchase food in the other part.
Jessica los, a first year student
and criminal justice major
said, “The cafeteria remodeling
was annoying because it’s
hard to get through without
interfering with the construction.”
although she likes how
everything is turning out.
The school has added in a
starbucks to the cafeteria
which is now open. several of
the employees are being
trained in this location so that
students will be able to buy
their choice of starbucks
drinks.
Some construction and renovating
is expected to begin
during the winter break with
the hopes of being finished
before classes start again in
January.
Bucks students have different
opinions about the renovations.
another Bucks student, Ray
harrison, a liberal arts American
studies major, says
the cafeteria is looking
better than it did,” even though
“it is inconvenient because i
have to walk through the construction.”
The cafeteria is coming
along and is beginning to look
really nice. liz fratti, a current
student explains that it
looks good, but she wants the
ATM machine to be put back.
liz said, “i like how it’s turning
out and i’m excited for the
starbucks.”
Kim, a cashier in the cafeteria,
said, “i think it will be a
big improvement for students.
we need to be patient with the
inconvenience. in the end, it
will be worth it.”
“Very noisy, very loud and
messy because of the dust and
it took a lot of patience.” Julie,
another cashier said, “i think it
will turn out to be beautiful. it
was long overdue for remodeling.”
from the last few years i
have gone to school here and
have noticed the few changes
as well. even though this
year’s construction in the cafeteria
is being changed around, i
am beginning to like the new
design that was set up. The old
cafeteria was nice, but they are
making a good choice by making
it look even better.
Taylor Casmirri, liberal arts
major from Newtown,
said that the construction
right now is noisy
and a bit inconvenient. she
says, “I like how it’s turning
out and excited for the finished
look.”
Another student, Kelly
Bilger, an early childhood
education major, says that,
“it’s annoying because when
you’re trying to concentrate,
it’s really tough.” although
she likes how it’s turning out,
she says, “I’m excited to see
how it turns out.”
With the cafeteria continuing
the construction during the fall
semester and through winter
break, many or most students
are excited to see the finished
look.
Cafeteria construction continues
Breanne Hillis
•
October 9, 2011